Hydraulic shoe heel lasting  machine basic operation steps

Hydraulic shoe heel lasting  machine basic operation steps
shoe heel lasting machine
1, according to the shape of the shoe last to choose the tensifier, sweep knife.
2. Turn on the power switch and start the oil pump motor.
3. Hold the shoe last with the left hand, and put the round hole in the shoe last into the top core of the support bracket. With the right hand, use the pull pliers to straighten out the back heel heel and then hold the guiding handle, and step on the foot start switch to complete the tensioning operation.
4. According to the production last type, comprehensively adjust the height of the support table and support pad, working speed, length of each movement stroke, temperature and pressing time to ensure the best effect of forming.
5. In case of glue spraying operation, turn on the glue spraying switch and the glue spraying heating switch first, and wait for the heating indicator light and the glue spraying heater to light up and turn green before the glue spraying operation. Adjust the amount of glue spraying and the clamping force of the rubber strip to ensure the normal glue feeding.
6, when the rubber strip is running out, do not remove the remaining rubber strip, insert the new rubber strip into the conductor groove, and immediately connect the old rubber strip.
Home    Shoes Machine Technology    Hydraulic shoe heel lasting  machine basic operation steps